Project Summary: A construction manager (CM) handling a 16-floor institutional library building in New York needed a coordinated electrical 3D modeling covering high-voltage and low-voltage systems, telecom and security systems, DAS, door access control, cable trays and conduits, panel circuiting, and photovoltaic (PV) systems.
Client identity protected under NDA. ISO 9001 / 27001 / 19650 / 14001 / 45001. Direct employees only. $2M E&O insurance (Everest, A+ AM Best).
The client needed 3D electrical models that stayed accurately coordinated as design information continued to evolve. Particularly, the manager needed Revit model to deliver:
Gsource worked from the client's input to produce a highly coordinated electrical 3D model and followed the given strategies.
| Item | Sheets | Hours |
|---|---|---|
| Revit electrical 3D model (LOD 350) covering high and low voltage, telecom & security, DAS, cable trays, panel circuiting, and photovoltaic systems Panel Schedules. | - | - |
| Panel schedules | - | - |
| 2D drawings output | - | - |
Working with Gsource's dedicated team, the CM received a precisely coordinated electrical 3D model, panel schedules, and drawing set that held up through continuous architectural and structural design changes. Cable trays stayed within clearance standards in constrained ceiling spaces; circuiting remained accurate and load-balanced across all panels, and clash-free fixture placement was maintained through regular coordination reviews. The client moved into construction with electrical documentation ready for constructability, on schedule, across all 16 floors.
"Electrical coordination with power, telecom, and photovoltaic systems all in play needed a team that wouldn't lose track of a single circuit. Gsource kept our panel schedules clean and our cable tray routing clash-free, even as our design kept shifting under them."
Client identity and project brand anonymized under NDA. Quote used with permission.
Bring in a dedicated team to keep your electrical models coordinated, constructable, and on schedule, even as the scope shifts and input evolves.
(Enter captcha image text in box)