Fire scope, MEP Permit Set, 4-Floor Industrial Facility
MEPF LOD 400 Modeling Delivered
Read full case studyFrom fire sprinkler design with hydraulic calculations to standpipe design and fire alarm design, our team handles fire safety system design and drawings built to your project's applicable code, whether NFPA in the US or EN standards in Europe. We deliver coordinated drawings and fire protection shop drawings, ready for submittal to your local approving authority. Direct employees only. ISO certified.
Years of Experience
Monthly Production Hours
Active Clients
MEPF Engineers
We deliver at the production scale, to your standards. A 50+ engineer MEP team produces 7,000+ production hours monthly.
| What we deliver |
|
|---|---|
| Output formats | DWG, DXF, and PDF, to your standards. |
| Best for | Fire protection contractors and MEP firms needing AHJ-ready fire sprinkler and alarm drawings. |
| Typical turnaround | Scoped to your permit or bid deadline and set at project kickoff; scales with package size. |
Not sure which output fits your project?
Numbers our clients hold us to, measured across every drawing and model we deliver.
On-time delivery
Drawing sets delivered on the schedule agreed at project kickoff, so your permit submissions and downstream project timelines stay on track.
Drawing accuracy
Verified against internal QC checklists and applicable code requirements before a set ever reaches your desk.
First-time client approval
Drawing sets approved by architecture firms on the first review round, with minimal revision cycles needed.
Revision request rate
Requests for rework after delivery, a reflection of the accuracy built into the drafting process from the start.
Client identities protected under NDA. Project details verified.
MEPF LOD 400 Modeling Delivered
Read full case studyPermit-Ready MEP Design Set Created for a 4-Floor
Read full case studyPermit-Ready MEP Design Set Created for a 4-Floor
Read full case studyClients are anonymized under NDA.
We deliver sprinkler and fire alarm drawings with hydraulic calculations, prepared for submission and aligned with applicable NFPA and EN54 standards.
You work with one accountable organization because all project work is handled by our direct employees, with no subcontractors involved.
We integrate your CAD/Revit standards, templates, layers, and documentation requirements into our workflow from day one.
You have one dedicated point of contact for project communication, coordination, updates, and issue resolution from start to finish.
We provide flexible production capacity that can scale up or down with your project pipeline, helping you manage workload peaks without adding permanent staff.
Clearly defined deliverables and fixed-scope milestones.
Ongoing technical support and on-demand expertise.
High-volume, multi-disciplinary, long-term integration.
Adaptive workflows & complex, evolving project requirements.
Review your templates, layers, fabrication standards, project requirements, and inputs to establish a consistent production workflow.
Develop an initial coordinated package or zone for your team to review, validate, and align before full-scale production.
Develop fire safety designs covering sprinkler and fire alarm systems, with coordinated layouts and documentation based on project requirements.
Perform documented ISO 9001 quality checks and inter-trade reviews to verify drawings against your standards and project requirements.
Deliver finalized DWG, DXF, and PDF files along with organized indexes and project logs for easy review and handoff.
No tool retraining. We adapt to your standards. We onboard to your CAD/Revit templates and standards in week one.
We’ll scope your design and production needs and standards, walk through similar programs, and share a vendor onboarding pack within one business day of a mutual NDA.
(Enter captcha image text in box)