Accurate Construction Documentation Provided for a 4-Floor Hotel

Accurate Construction Documentation Provided for a 4-Floor Hotel

Introduction

Gsource Technologies supported a Utah-based hospitality developer in transforming concept plans into precise construction documentation for a 56,473 sq. ft., four-floor hotel. The mixed-occupancy structure demanded strict adherence to multiple codes, requiring a detailed, coordinated approach to deliver code-compliant Revit drawings within just 10 business days.

Challenges Faced

  • Mixed Occupancy Complexity:

The hotel combined R-1 (lodging), A-2 (restaurant), B (business), and S-1 (storage) occupancies, which required clear separation and compliance with a broad range of codes.

  • Disparate Inputs:

Concept plans arrived in DWG format, while critical reference details were buried in a prototype PDF, making alignment and interpretation time-consuming.

  • Code Compliance Burden:

The project required navigation of several stringent standards, including 2015 IBC, IECC, and NFPA, as well as mechanical, plumbing, accessibility, and electrical codes from multiple years.

  • Large Project Scale:

Coordinating documentation for over 56,000 sq. ft. across four levels while avoiding cross-discipline conflicts posed a significant challenge.

Approaches and Solutions

  • Integrated Modeling:

The team imported DWG concept files into Revit, building a comprehensive 3D model aligned with prototype references.

  • Code-Driven Detailing:

Each occupancy area was modeled according to its specific code requirements, ensuring correct fire ratings, access routes, and ventilation strategies.

  • Discipline Coordination:

Structural, MEP, and architectural elements were coordinated throughout the model to prevent design clashes and streamline construction.

  • Fast-Track Delivery:

The project was delivered within 10 business days, aided by checklists and automation tools that helped accelerate review and validation.

Final Outcome

The client received a complete, code-compliant CD set in Revit and PDF formats, ready for permit submission and construction execution, delivered on schedule and without rework.

Client Overview

A hospitality group developing mid-rise hotels with integrated amenities and complex multi-use spaces across the U.S.

Pavan Mulik
Vice President of Operations

Pavan Mulik is the Vice President of Operations at Gsource Technologies and also serves as Account Manager for Structural and Mechanical Design. With extensive expertise in civil engineering, land surveying, and BIM, he excels at managing complex workflows and driving cross-functional collaboration. His strategic approach ensures smooth project execution at any scale. Outside work, he enjoys exploring landscapes and architectural marvels for inspiration.

(Enter captcha image text in box)

USA (Corporate Address)

UAE

Pune